Sub-Panel Installation

Sub-panel installation is the process of adding a secondary electrical panel to a property to expand its electrical capacity or provide dedicated power to specific areas, such as a garage, workshop, or addition. A sub-panel is connected to the main electrical panel and distributes power to additional circuits, making it an ideal solution for properties with growing electrical demands or specialized equipment that requires isolated circuits.

The installation begins with an assessment of the electrical needs for the area served by the sub-panel. This includes calculating the load for devices, appliances, or systems that will be powered, such as lighting, outlets, or heavy machinery. The sub-panel’s capacity, measured in amps (e.g., 60, 100, or 125 amps), is chosen based on this load calculation to ensure it can handle the demand without overloading the main panel. The sub-panel must also be compatible with the main panel’s specifications and the overall electrical service size.

The sub-panel is typically installed in a convenient, accessible location near the area it will serve, such as a garage or basement. It is mounted securely to a wall or frame, with adequate clearance as required by local codes for safety and maintenance. A feeder cable, consisting of hot, neutral, and ground wires, is run from the main panel to the sub-panel. The cable size and type (e.g., copper or aluminum) are selected based on the distance and load requirements to minimize voltage drop and ensure efficient power delivery.

In the main panel, a dedicated circuit breaker is installed to feed the sub-panel, acting as its main shut-off and protecting the feeder cable from overloads. Inside the sub-panel, individual circuit breakers are installed to distribute power to the new circuits. The sub-panel includes separate neutral and ground buses to maintain proper grounding and prevent electrical faults. In some cases, a separate grounding rod is required for the sub-panel, depending on local codes and the distance from the main panel.

Wiring for the new circuits is installed from the sub-panel to the intended outlets, switches, or devices. This may involve running conduits or cables through walls, floors, or ceilings, ensuring they are properly insulated and protected. All connections are made with precision to prevent loose contacts, which could lead to arcing or overheating. The installation adheres to the National Electrical Code (NEC) and local regulations, which specify requirements for breaker sizes, wire gauges, and grounding.

Safety features, such as ground-fault circuit interrupters (GFCIs) or arc-fault circuit interrupters (AFCIs), may be incorporated into the sub-panel’s circuits, depending on the application. For example, GFCIs are required for circuits in wet areas like bathrooms or outdoor spaces. Once the installation is complete, the system is tested to ensure all circuits function correctly and the sub-panel operates within safe parameters. A local building inspector typically reviews the installation to verify compliance before it is energized.

Sub-panel installation provides a flexible and efficient way to expand a property’s electrical capacity. It allows for dedicated power distribution to specific areas or equipment, improves system organization, and enhances safety by reducing the load on the main panel. With proper planning and execution, a sub-panel can support a property’s evolving electrical needs for years to come.